# Climate Action Plan 2025 Q4 Progress Report

Source: https://assets.gov.ie/static/documents/997e4afc/Climate_Action_Plan_2025_Q4_Progress_Report.pdf

## Front Matter

### Front Matter

*Pages 1–2*

*Text from page 1 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

. a. WE’RE Rialtas na hEireann TAKING Government of Ireland _ CLIMATE * ACTION

Climate Action Plan

### 2025

Q4 Progress Report

a

Prepared by the Department of tot thatacise gov.ie/ClimateAction

Table of Contents

1 Executive Summary ............................................................................................ 3

2 Agriculture ............................................................................................................ 5

3 Transport .............................................................................................................. 8

4 Electricity ............................................................................................................ 11

5 Buildings .............................................................................................................. 14

6 Industry ............................................................................................................... 17

7 Land Use, Land Use Change and Forestry (LULUCF) .............................. 19

8 Cross-cutting actions ....................................................................................... 22

## 1 Executive Summary

### 1 Executive Summary

*Pages 3–4*

*Text from page 4 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

1Executive Summary

This Progress Report on the Climate Action Plan (CAP) 2025 details progress on the new

actions that were due for completion in Q4 2025. In total, 16 of the 37 new Q4 actions

have been delivered on time (Table 1).

2 of the 17 delayed actions from Q1, Q2 and Q3 were also delivered in Q4 (Table 2).

Overall implementation of CAP25 stands at 46 actions out of 82 completed by year end.

High impact actions delayed from CAP24 and CAP23 are also included in this report. Of

the 43 legacy actions remaining, 5 were completed in Q4 2025 (Table 3).

Delays in climate action delivery in Q4 are attributed to several factors including: time

required for legislative responses; delays arising from public consultation; and

dependencies on other actions or policies. These delays threaten Ireland’s ability to meet

binding emissions targets and risk increasing future pressures, costs, environmental

damage and reputational harm. While delivery results in 2025 show that a lot has been

achieved, we need to increase efforts if Ireland is to close the emissions gap.

All delayed and legacy actions will continue to be reported upon into 2026, maintaining

visibility as to their delivery.

To provide more detail on progress, risks and delivery profiles, this report is organised

into sectoral chapters in order of emissions share, with a further chapter on cross-cutting

activity. As in previous progress reports, attention is given to Key Performance Indicators

(KPIs), national emissions trends and projections.

Information on each reportable action from the CAP25 Annex of Actions is contained at

Appendix 1.

To keep up to date with the Government’s Climate Action Initiatives, subscribe to the

monthly Climate Action Newsletter mailing list here.

Table 1 Delivery by Department on new Q4 2025 actions

DCEE 3 13 DAFM 3 5 D/Transport 5 12 DHLGH fe) 1 DETE 3 3 DFHERIS fe) 1 DPER 1 1 DFIN 1 1 TOTAL 16 37

Table 2 Delivery by Department on delayed Q1, Q2 & Q3 CAP 2025 actions due in Q4 2025

DCEE fe) 9 DAFM 1 1 D/Transport 1 5 DHLGH fe) 2 TOTAL 2 17

Table 3 Delivery by Department on legacy actions due for reporting in Q4 2025

DCEE 1 24 DAFM 3 5 D/Transport fe) 7 DHLGH 1 2 DPER fe) 3 DETE fe) 2 TOTAL 5 43

## 2 Agriculture

### 2 Agriculture

*Pages 5–7*

*Text from pages 6, 7 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

2Agriculture

Agriculture was responsible for 36.2% of national emissions in 2024, making it the

largest GHG emitting sector in Ireland. There are additional agriculture-related emissions

from grasslands used for farming, which are accounted for within LULUCF emissions. In

2024, agricultural emissions were 20.45 MtCO2eq, a decrease of 1.3% on 2023 levels.

This decrease was driven in large by reductions in overall cattle numbers. In 2024,

methane (CH4) emissions contributed 71.2% to the Agriculture sector, originating from

enteric fermentation, manure management and fuel combustion.

![Figure from page 5](assets/p005-f01.webp)

*Figure from page 5*

![Figure from page 5](assets/p005-f02.webp)

*Figure from page 5*

Figure 1: Agriculture sector emissions share in 2024

At the end of Q4, one CAP25 Agriculture

Action remains outstanding in relation to the

challenge of securing access to, and cost of,

feed in the organic livestock sector’ (see

case study).

CAP25 Q2 Action AG/25/4, Publish Action

Plan on Reducing Age of Slaughter, has been

completed. Minister Heydon launched the

‘Improved Liveweight Performance Action

Plan,’ to enhance economic and

environmental sustainability across Ireland's

beef sector.

Makin Eto °

More Sustainable

500,000 400,000 400,000 wo ’ ® 300,000 350,759 348,719 5 312333 345,761 335,266 8 200,000 100,000 0 2018 Baseline 2022 2023 2024 Q4 2025

Legacy Actions

Establish group and finalise an implementation report for a just climate transition in agriculture

Review maximum nitrogen limits Publish draft carbon farming framework

New/updated measures from the Teagasc MACC included in the Climate Action Plan

Industry agreement for tracking the use of methane reducing ingredients

—) Cow reduction scheme

Completed on Time Completed subsequently

Delayed

Discontinued

lreland’s Climate Action Plan sets ambitious targets for expanding organic farming, improving biodiversity, and reducing reliance on chemical fertilisers. A major barrier to achieving these goals has been identified in a lack of domestic organic feed milling

capacity, which limits growth in both organic livestock and tillage sectors.

A 12-month Policy and Strategic Studies Research Call (PSSRC) Project, Feasibility

Assessment for Organic Feed Milling (FARM), has been agreed and a researcher

appointed with work to begin December 2026.

This research will address four core objectives to provide a framework to allow the

sector to move forward, as follows: Assess current and future farm-level production of organic feed crops in Ireland

° Evaluate the technical and economic feasibility of organic feed processing

options post-farm gate

° Analyse environmental, social, and economic sustainability impacts across the

value chain Identify policy and support mechanisms to enable organic feed milling capacity

° The findings will inform farmers, industry stakeholders, policymakers, and the

wider agri-food sector.

Completion date is now expected to be Q4 2027.

## 3 Transport

### 3 Transport

*Pages 8–13*

*Text from pages 9, 10, 11, 12, 13 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

3Transport

The Transport sector was responsible for 20.9% of total greenhouse gas emissions in

Ireland in 2024. The emissions from this sector are the second biggest (after Agriculture)

and have experienced the largest increase of all sectors since 1990. Figure 4 indicates

that the measures implemented, and the speed at which this takes place, will determine

the rate at which transport emissions decline by 2030 (to reach between 9.74 and 11.24

Mt CO2 eq. according to the EPA projections, short of the 6 MT target).

![Figure 4: Gap to Target – Transport](assets/p008-f01.webp)

*Figure 4: Gap to Target – Transport*

|  |  |  |
| --- | --- | --- |
| Figure 3: Transport sector emissions share in 2024 |  |  |

10 new Transport Actions were due for

completion in Q4 2025. Of these, 4 were

completed on time, including a targeted

follow-up advertising campaign encouraging

a switch to sustainable transport modes, as

well commencing theconstruction of the

Liffey Valley core Bus Corridor scheme in

December 2025 with an expected

completion date of 2028.

Of the 5 delayed CAP25 Q3 Transport

Actions, only one was completed this

quarter – commencement of work to

develop a new Sustainable Mobility Policy

Action Plan for 2026 to 2030.

![Figure from page 8](assets/p008-f02.webp)

*Figure from page 8*

Transforming How We Travel

2025 and 2030 EV Targets

Legacy Actions

Publish National Demand Management

Strategy Q Publish Policy Statement on Mobility Hubs No new high impact reportable actions for Restore Shannon-Foynes to Limerick rail delivery this quarter freight line

go Delivery of c.150 charging points under the Destination Charge Point Scheme

x) Progress renewable fuel legislation

g Completed on Time ') Completed subsequently

x) Delayed 4

* Based on Fuel Excise Clearances data which provide a proxy for sales and the associated level of consumption.

Delayed CAP25 Action TR/25/15 Roll out of key elements of electric vehicle (EV) Infrastructure Strategy

While all schemes under this Action have been launched, the roll out of key elements of the EV Infrastructure Strategy has been delayed in 2025. Significant work in this area has taken

place. For example:

e An initial batch of Light Duty Vehicle (LDV1) sites have been connected to the grid (8 chargers) and were operational before the end of 2025 and work is now continuing to move the LDV1 charging programmes into full delivery. Most of these sites were impacted by a lack of grid capacity. It is expected that the remaining sites will have access to the grid in H1 2026.

These initiatives will significantly expand high-power charging availability across the national, regional and local road network, creating a more convenient and reliable system for drivers nationwide. The LDV2 scheme was awarded in 2025, and several locations were energised in 2025, as per CAP24 legacy action TR/24/22.

Local Authorities are continuing to develop their EV Charging Infrastructure Strategies and will commence implementation planning for projects arising from these strategies in 2026.

Zero Emission Vehicles Ireland (ZEVI) has developed a Local Authority EV Charging infrastructure pilot programme, aiming to develop knowledge and explore innovative solutions for EV charging infrastructure across Local Authorities. Work will continue regarding the roll out of 26 pilot projects across 15 Local Authorities. These pilots include new innovations in renewables, battery backup, behind the meter solutions and flexible payments such as discounted off-peak Neighbourhood Charging. The roll out of these pilots will complete in Q4 2026 and follow the delivery of the first pilot in Westside, Galway City earlier in the year. All infrastructure implementation planning will commence in 2026 and thereafter will be multi-annual as move to delivery in 2027.

Overall, there has been steady growth in the number of EV registrations in Ireland. In October 2025, the Minister for Transport announced that Ireland had already met its CAP target of 195,000 EVs on the road by year-end, a key milestone in the nation’s transition to cleaner transport. By the end of Q4 2025, more than 200,000 EVs had been registered. The EV

Infrastructure Strategy will continue to be critical to keeping pace with this continued growth.

4 Electricity

Energy industries (primarily electricity generation) accounted for 12.3% of national

emissions in 2024. Electricity emissions decreased for a third consecutive year in 2024

and are now at an all-time low across the 1990 to 2024 time series at 7.2 Mt CO2eq.

Reductions are in part due to the increased share of net electricity imports as well as

increased renewable generation. In 2024, renewables accounted for c.40% of electricity

demand in Ireland.

Gap to Target

my

Electricity 12%

Figure 5: Electricity sector emissions share in 2024

=—@® EPA Projections (WAM) “© EPA Projections (WEM)

Figure 6: Gap to Target - Electricity

3 new Electricity Actions were due for completion in Q4, none of which were completed on time. These include key Actions such as Develop a data sharing framework regarding low carbon technologies (LCT) connected to the electricity grid and demand

None of the 2 previously delayed CAP25 Electricity Actions nor the 6 outstanding Electricity Actions from CAP23 and CAP 24

were completed in Q4.

As of end-December 2025, Ireland fell short of its 2025 target, achieving 5.028GW of installed onshore wind capacity (c.84% of the 6GW target).

Develop. consumer-led _ flexible

Processes.

hy Powering Renewables

Electricity KPI —Installed wind capacity

10 = 8 @ & = & GS 2 of 0 2018 Baseline 2022 2023 2024 2025

Legacy Actions

Publish the Renewable Electricity Spatial Policy Framework

ooo 8 8 8

Publish a roadmap for the development and implementation of Regional Renewable Electricity Strategies

Revise National Planning Framework to include capacities to allocate national renewable targets regionally

Publish Regional Renewable Electricity Strategies

Develop a Private Wires Policy Framework

Implement Hybrid Connection Roadmap

g Completed on Time iY) Completed subsequently

xX) Delayed

A new National Planning Statement (NPS) on Wind Energy under the new Planning

and Development Act 2024 will address key policy considerations such as noise, setback distance, shadow flicker, community obligation, community dividend and grid

connections.

Work to advance guidance on the noise aspect of the National Planning Statement,

which is highly technical in nature, is now substantially complete.

In line with EU Directive requirements, a Strategic Environmental Assessment (SEA) will be carried out on the draft National Planning Statement. It is intended to undertake a public consultation on updated draft NPS as part of the SEA process whereby all interested parties will have an opportunity to submit observations on the draft National Planning Statement. The finalised National Planning Statement will be prepared following detailed analysis and consideration of the submissions received

during the consultation phase.

fi ~) 13

## 5 Buildings

### 5 Buildings

*Pages 14–16*

*Text from pages 15, 16 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

5Buildings

In 2024, 12.3% of Ireland’s emissions came from Buildings (mostly residential buildings).

Ireland is progressing with a major transformation of its building stock, including plans to

retrofit 500,000 homes by 2030, roll out large-scale district heating in densely populated

urban areas, and enhance energy performance standards for commercial buildings.

![Figure 8: Gap to Target - Buildings](assets/p014-f01.webp)

*Figure 8: Gap to Target - Buildings*

![Figure from page 14](assets/p014-f02.webp)

*Figure from page 14*

Figure 7: Buildings sector emissions share in 2024

In Q4, one new Buildings Sector Action was

due for completion to develop a first draft of

the National Building Renovation Plan. This

action was delayed (see case study).

None of the 3 delayed CAP25 Q3 Buildings

Sector Actions were completed in Q4.

Similarly, none of the 10 outstanding

Buildings Sector Actions from CAP23 and

CAP24 were completed in Q4. Key legacy

Actions that require prompt delivery include

Develop and publish a roadmap, to phase out

fossil fuel heating systems in all buildings, and

Publish a National Heat Policy Statement.

Building Better

Legacy Actions

Publish a roadmap to phase out fossil

oe 8 8 8 8 ee

fuel heating systems in all buildings No new high impact reportable actions for Publish a National Heat Policy Statement delivery this quarter "Publish report on the split incentive for rental properties Publish roadmap for long-term

decarbonisation of commercial buildings

Provide a national level assessment of potential candidate areas for district heating

Implement the SEAI Business Energy Upgrades Scheme

Develop regulations to effectively ban fossil fuel boilers in new dwellings

Provide the legislative basis for the regulation of geothermal energy

*This KPI shows the number of B2s delivered but does not include the impact of non-B2 retrofits. For more information please refer to the SEAI Home Energy Upgrades annual report

The Department of Climate, Energy and the Environment (DCEE) is progressing the

development of a draft National Building Renovation Plan (NBRP), with input from multiple Departments and Agencies, in line with this CAP action. Prior to this submission, a public consultation on the draft plan is required, involving local and regional authorities and other socioeconomic actors, including civil society and bodies

working with vulnerable households.

As work remains ongoing between DCEE and the Department of Housing, Local Government and Heritage (DHLGH), it has not yet been possible to carry out a public consultation on a draft version of the NBRP. DCEE is continuing to work cross- Departmentally to progress these matters and a public consultation process on the NBRP will be undertaken before it is submitted by the end of 2026 in line with the Energy Performance of Buildings Directive (EPBD).

## 6 Industry

### 6 Industry

*Pages 17–21*

*Text from pages 18, 19, 20, 21 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

6Industry

In 2024, Industrial emissions accounted for 10.9% of Ireland's total emissions.

Manufacturing combustion and industrial processes are the key emission sources.

Industry emissions are largely affected by cement production in Ireland, which in turn

can be impacted by economic cycles.

![Figure from page 17](assets/p017-f01.webp)

*Figure from page 17*

|  |  |  |
| --- | --- | --- |
| Figure 9: Industry sector emissions share in 2024 |  |  |

2 new Industry Actions were due for

completion in Q4, of which 1 was completed

on time: Publish annual spending by enterprise

agencies on client decarbonisation projects

under Environmental Aid Programme and

Green Transition Fund. The spending details

can be found in this report’s Annex of

Actions.

![Figure from page 17](assets/p017-f02.webp)

*Figure from page 17*

Greening Industry

65.6% 63.8% 63.7% 2022 2023 2024

==2025 Target =—=Progress

No new high impact reportable actions for delivery this quarter

No new high impact reportable actions for delivery this quarter

g Examining options that may incentivise electrification of heat

@ Propose tax measures to incentivise the installation of energy efficient equipment

Publish annual spending by enterprise agencies on client iv) decarbonisation projects under Environmental Aid Programme and Green Transition Fund

'X) Publish a report on work of the Carbon Capture Utilisation and Storage Taskforce

7 Land Use, Land Use Change and Forestry (LULUCF)

In 2024, Ireland’s emissions from land use were 4.5% of total emissions. The LULUCF

sector has been an emissions source in Ireland since 1990. It has a challenging future

profile for emissions generation due to the ageing profile of existing trees, continued low

planting rates and large areas of drained emissive peat soils used for farming, forestry

and peat extraction.

LULUCF Emissions

LULUCF 5%

|

|| Baseline Estimated 2030 target

=@= EPA Projections (WAM) =e EPA Projections (WEM)

Figure 11: LULUCF sector emissions share in 2024

Figure 12: Expected LULUCF Emissions

Two new LULUCF Actions were completed in Q4 on time, Undertake formal midterm review of the Forestry Programme 2023-2027 (see case study) and Publish Coillte’s Land- Use Strategic Implementation Plan, available

target and Publish report of Phase 2 of the Land Use Review. Neither Action was

completed in Q4.

here.)

By the end of Q4 2025, 2,527 hectares of forest had been planted over the year, well below the CAP25 target of 8,000 hectares

There were 2 delayed CAP25 LULUCF Actions: Review progress towards 2030 KPI of an additional 30,000 ha of _ peatland

to be planted annually.

rehabilitation and explore potential to increase

Changing Our Land Use

10,000 8,000 8,000 8 6,000 8 ° @ 4,000 2,527 5 000 1,652 1,573 0

Legacy Actions

Review proposed Teagasc MACC measures to determine which actions are possible to deliver sustainably across all land use types and provide a detailed mapping exercise to achieve the EU LULUCF regulation target

g Completed on Time

VY) Completed subsequently delivery this quarter

x) Delayed

The Forestry Programme for the period 2023-2027 aims to encourage a substantial increase in afforestation by offering attractive and diverse options for planting to support our national target of 8,000 hectares of new forests per year. It also provides for a range of schemes to support the maintenance and sustainable management of existing forests.

In 2025, Department of Agriculture, Food and the Marine (DAFM) has undertaken a Mid-Term Review (MTR) of the Forestry Programme in conjunction with members of the Forest Strategy Consultative Committee (FSCC), which represents a broad range of Forestry stakeholders. The existing measures and schemes were reviewed with a view to improving their performance for the remainder of the Forestry Programme 2023-2027 term, to help fulfil our existing forestry policy objectives. The European Commission have been notified of proposed changes.

The proposed outcomes from this Mid-Term review are required to be screened, to determine if they would have any significant effects on the environment. DAFM has accordingly issued a notice of screening to the prescribed statutory authorities.

In addition, following Storms Eowyn and Darragh, significant damage was caused to both Coillte and privately owned forests. This has necessitated substantial re-planning of forest operations over the short and medium in the forest sector as it aims to recover the windblown timber. DAFM has established a Forest Windblow Taskforce which comprises of stakeholders representing forest owners, forestry companies, Teagasc and Coillte. It is meeting regularly to work collaboratively and is focusing on providing practical solutions immediately to those landowners whose forests have been adversely affected and are faced with a major clean-up operation in dealing with fallen trees.

Satellite imagery assessments are indicating that just over 26,000 hectares of forestry have been damaged by windblow, including approximately 13,000 in private ownership. Government approval has now been received to launch a new €55 million Reconstitution Scheme for qualifying private forest owners. The Scheme will provide support to private forest owners for replanting their damaged forest areas. This Scheme is in alignment with the Forestry Programme 2023-2027, which contains a general Reconstitution measure that aims to restore and retain forest land and forest ecosystems following significant damage events. Development of this Scheme is underway, and it is expected that applications for the scheme will open in early 2026.

## 8 Cross-cutting actions

### 8 Cross-cutting actions

*Pages 22–24*

*Text from page 23 of the source PDF is machine-read (OCR) from a scanned image and may contain recognition errors.*

8Cross-cutting actions

Cross-cutting actions support the delivery of sectoral climate action through improvements in

governance, finance, planning, research, citizen engagement, circular economy, adaptation, and

public sector leadership. Several Departments and Agencies contribute to the completion of

such actions, providing a whole-of-Government response and enabling framework for national

climate action. Information on all cross-cutting actions due for reporting is at Appendix 1.

18 new Cross-Cutting Actions were due for completion in Q4. Of these 9 were completed on

time, including key Actions such as Provide business supports to Small and Medium-sized Enterprises

(SMEs) in the tourism outdoor and recreation sector and Develop ‘green budgeting’ analysis of

expenditure allocations to align with performance reporting.

As featured in the CAP25 Q2 & Q3 Progress Report, the Sectoral Adaptation Plans (SAPs) were

approved by Government in Q4 at a Government Meeting on 7 November 2025. The 13 sectors

are grouped according to the themes of Natural Environment, Built Environment and

Infrastructure, Human, and Economy. Further information on the SAPs is available here.

4 delayed CAP25 Cross-Cutting Actions were also due for reporting in Q4, of which 0 were

completed. These actions included; Publish SEAI’s Energy Research Strategy (under the Research

and Innovation Chapter) and Development of a National Exploration Programme for Critical Raw

Materials (under the Circular Economy Chapter).

2 out of 16 outstanding Cross-Cutting Actions from CAP23 and CAP24 were completed in Q4.

One such completed Action under the Adaptation Chapter was to Improve the resilience of

Ireland’s water infrastructure through implementation of a Nature Based Solutions (NBS) Programme.

Completion of this Action led to the planting of 53,925 native trees over 2024 and 2025,

surpassing the target of 50,000 native trees. Uisce Éireann has completed 6 Drainage Area Plans

and installed 3 Sludge Drying Reed Beds (SDRB’s) as per this Action’s output.

Key legacy Actions that remain outstanding include Develop MPPS and Marine Planning Guidelines;

Develop comprehensive legislation for the identification, designation and management of Marine

Protected Areas and Unallocated savings allocated across sectoral emissions ceilings and approved by

Government.

![Figure from page 22](assets/p022-f01.webp)

*Figure from page 22*

#### ef) Cross-cutting

Legacy Actions

1. Develop Marine Planning Policy Statement and Marine Planning Guidelines
2. Enact Marine Protected Areas legislation
3. Update climate action roadmaps by public sector bodies

x) Publish a 2nd whole-of-Government Circular Economy Strategy

g Publish Climate Change Risk Assessment

No new high impact reportable actions for delivery this quarter

No new high impact reportable actions for delivery this quarter

Support the implementation of projects under the Local and Regional Economic Strategies Support Scheme

All Sectoral Adaptation Plans approved and published

Develop ‘green budgeting’ analysis of expenditure allocations to

‘/) Completed on Time align with performance reporting

Deliver Phase 2 of the Local Authority Climate Action Training Programme to ensure local authority staff and elected members can access relevant and practical climate training

![Figure from page 24](assets/p024-f01.webp)

*Figure from page 24*